Technical services in mechanical engineering

We provide a comprehensive portfolio of technical services in mechanical engineering, covering the full lifecycle of industrial projects—from concept and design to implementation, optimization, and long-term support.

Our focus is on delivering robust, efficient, and manufacturable solutions tailored to specific industry requirements, ensuring reliability and sustainable performance.


Scope of Engineering Services

Our services are designed to support all phases of product and system development.

Core Capabilities

  • Engineering consulting and technical analysis
  • Mechanical design and CAD development
  • Creation of technical drawings and documentation
  • Design optimization for manufacturability and cost efficiency

These services form the foundation for high-quality and reliable engineering outcomes.


Reverse Engineering and Modernization

In addition to classical engineering, we offer advanced reverse engineering services.

Applications

  • Reconstruction of existing components and systems
  • Reproduction of spare parts
  • Modernization of legacy equipment
  • Performance optimization and redesign

This approach is particularly valuable when documentation is incomplete or systems require upgrading.


Engineering Outsourcing

Our outsourcing services provide flexible access to engineering expertise without increasing internal resources.

Key Advantages

  • Seamless integration into existing workflows
  • Scalable engineering capacity
  • Consistent quality and adherence to deadlines
  • Reduced overhead and operational costs

We act as an extension of your team, ensuring efficient and reliable project execution.


Project Management and Coordination

Project management is an integral part of our service offering, ensuring structured and controlled project execution.

Services Include

  • Planning and definition of project scope
  • Resource allocation and scheduling
  • Coordination of teams and stakeholders
  • Monitoring of progress, quality, and costs
  • Risk management and problem solving

This ensures transparency, efficiency, and successful project delivery.


Automation and Control Systems

We specialize in automation solutions that enhance productivity and process stability.

Automation Services

  • PLC programming and control system development
  • Integration of machines and automation systems
  • Process optimization and workflow improvement
  • Enhancement of system reliability and safety

These solutions help reduce downtime and improve operational efficiency.


Integrated Service Portfolio

Our multidisciplinary expertise allows us to provide complete engineering support.

Overview of Services

  • Engineering and consulting
  • Mechanical design and CAD development
  • Technical drawings and documentation
  • Reverse engineering and redesign
  • Engineering outsourcing
  • Project management and coordination
  • Automation and system integration
  • PLC programming and industrial control systems

Your Benefits

Working with Roltec ensures measurable value across your projects.

Key Benefits

  • High-quality and practical engineering solutions
  • Reduced development risks and errors
  • Efficient and cost-optimized processes
  • Flexible and scalable support
  • Reliable project execution and long-term performance

Conclusion

Technical services in mechanical engineering require a combination of expertise, structure, and practical experience. With a holistic approach and strong engineering capabilities, Roltec delivers efficient, reliable, and value-driven solutions for industrial applications.



Engineering services in machine manufacturing

First and foremost are the requirements that each mechanical component must meet. Together with the ...

3D Design of Customised Products

Our company specializes in providing mechanical design services for plants, machinery, equipment and...

Project Management and Technical Consultancy

Project management involves planning, steering and controlling projects to achieve project results o...

Technical drawing

We can create drawings of any complexity based on the customer’s templates or original data, such as...

Mechanical Manufacturing and Custom Parts

As an engineering company, we provide clever structuring that ensures first-class manufacturing of m...